L y c r a m a n  
    Start  > Gallery  > Longs  > Orange Body Co  > 5  
    Uploaded 02-12-08  



Orange Body Co

With a cable car and an adjoining shabby chairlift we were lifted up to almost 4000 metres, from where we hiked up the glacier to the Diesel Hut about 200 metres higher. This makeshift hut was planned to be our base for the climb of Elbrus.

   

More Orange Body Co pics







 















More... More Orange Body Co pics